A Powerful Engine for Schedule Processing
Whether you’re scheduling as soon as possible (ASAP) or as late as possible (ALAP), Planilog uses powerful resource/constraint-based scheduling algorithms to help you improve workflows in real time.
Constraint-Based Optimization (APS)
Integrate your business constraints according to configurable scenarios. Define specific priorities by resources, activities, periods, etc. Apply a lock on activities or resources that should not be scheduled (eg maintenance, vacation, sickness and other non-production activity).
Inventory Management and Supplies
Order according to the current or future availability of raw materials or semi-finished products. Outstanding stocks (inputs / outputs) are updated at the frequency you specify.
Skills Management and Resource Groups
Assign skills to each of your resources to optimize load distribution over time. Optimize Finite Capacity Constrained Production Capacity (Material Resource Planning II - MRP II).
Heuristic and metaheuristic methods
Solve the most complex scheduling problems using a heuristic algorithm (greedy optimization) and / or metaheuristic algorithm (ant colony optimization - ACO).
Dissemination of scheduling results
After launching the constraint scheduling engine, view the results in your Gantt chart or list. You may then manually edit the results. Distribute results through different channels: export to CAPM / CMMS, hard copy reporting, on-screen display.
Ready to get started?
Start your free trial today or contact us if you have any questions.